23.01.2016 HIGH BRIDGE INSTALLATION


As part of the construction works of a new lock weir in Harelbeke (Belgium), the new ‘High Bridge’ has been put on Saturday January 23. The bridge was transported over the river Leie from the quay to her new spot. Around 4 PM the bridge already reached her destination and could be let down. The completion works can now start and will be followed by the construction of the slip roads.