JETTY - Construction of a jetty
Extension of a jetty for Rubis
Extension of the existing jetty that was built in 2009.
Piling works:
- 169 steel foundation piles
- 27 steel piles for maritime constructions
Concrete works:
- +-5000m³ concrete
Steel constructions:
- 300m piperacks
- hose tower on the main platform
- a total of +/- 400T steel
Maritime constructions:
- 5 guiding works and 17 mooring posts
- 250m steel footbridges
Constructor(s):
Herbosch-Kiere
Project duration: